YANTAI TONDA RUBBER & PU CO., LTD.

Correct Installation Method of Polyurethane Strip Sieve

According to the structure of polyurethane strip sieve, there are four types: mosaic type, bolt connection, press bar connection and sieve hook connection.

Polyurethane strip sieve press bar connection: Please first place the strip sieve on the sieve surface, and then install it according to the supporting beam structure of the sieve. Generally, the screw holes should be drilled at appropriate distances between the two sides of the sieve machine and the upper layer of the sieve plate along the cutting direction with a U-shaped strip iron plate of suitable width, and then tightened with bolts and the bottom support beam to firmly fix the sieve plate in the middle. Rubber strips (old rubber hoses can be used) are used to pad the contact surface between the supporting beam and the strip iron plate and the sieve plate. This method can also be applied to the upper part of the supporting beam in the middle of the sieve.

Product characteristics:

(1) The vertical and horizontal strips of screen mesh are made of high wear-resistant polyurethane material, and the strips contain steel wires. Its service life is 3-10 times longer than that of traditional metal screen.
(2) It has unique structure, suitable elastic and plastic force, which can not only reduce the jam, but also reduce the sticking due to the second harmonic high-frequency vibration of the screen bar. Practical opening rate is high, and screening efficiency is high.
(3) There are elastic tension hooks on both sides of the screen. The overall weight is light, the flexibility is good, the transportation and storage are easy, and the installation and disassembly are convenient.
(4) Screen can effectively absorb shock, reduce noise and improve working environment.

  • TEL:+86-535-6800601
  • FAX:0535-6800621
  • EMAIL:sales@tonda-pu.com
  • ADDRESS:No.8 Tongli Road, Zhifu District Yantai, China